ENTERGY MISSISSIPPI INC (66901) 10-Q published on Aug 06, 2018 at 6:11 pm
Reporting Period: Jun 29, 2018
Entergy Nuclear Vermont Yankee has an outstanding credit facility with borrowing capacity of $145 million to pay for dry fuel storage costs. This credit facility is guaranteed by Entergy Corporation. At or before closing, a subsidiary of Entergy will assume the obligations under the existing credit facility or enter into a new credit facility, and Entergy will guarantee the credit facility. At the closing of the sale transaction, NorthStar will pay $1,000 for the membership interests in Entergy Nuclear Vermont Yankee, and NorthStar will cause Entergy Nuclear Vermont Yankee to issue a promissory note to an Entergy affiliate. The amount of the promissory note issued will be equal to the amount drawn under the credit facility or the amount drawn under the new credit facility, plus borrowing fees and costs incurred by Entergy in connection with such facility. The principal amount drawn under the outstanding credit facility was $108 million as of June 30, 2018. The transaction is expected to result in a loss based on the difference between Entergy’s net investment in Entergy Nuclear Vermont Yankee and the sale price plus any agreed adjustments. As of June 30, 2018, the adjusted net investment in Entergy Nuclear Vermont Yankee was $245 million. The primary variables in the ultimate loss are the values of the nuclear decommissioning trusts and the asset retirement obligations at closing, financial results from the plant until the closing, and any changes in Entergy’s investment in Entergy Nuclear Vermont Yankee before closing.
In February 2016 the FASB issued ASU No. 2016-02, “Leases (Topic 842).” The ASU’s core principle is that “a lessee should recognize the assets and liabilities that arise from leases.” The ASU considers that “all leases create an asset and a liability,” and accordingly requires recording the assets and liabilities related to all leases with a term greater than 12 months. In January 2018 the FASB issued ASU No. 2018-01, “Leases (Topic 842): Land Easement Practical Expedient for Transition to Topic 842,” providing entities the option to elect not to evaluate existing land easements that are not currently accounted for under the previous lease standard. In July 2018 the FASB issued ASU No. 2018-11, “Leases (Topic 842): Targeted Improvements,” which is intended to simplify the transition requirements giving entities the option to apply the transition provisions of the new standard at the date of adoption instead of at the earliest comparative period presented and provides a practical expedient for the separation of lease and nonlease components for lessors. Entergy plans to adopt ASU 2016-02 along with the practical expedients provided by ASU 2018-01 and 2018-11 when they become effective for Entergy in the first quarter 2019. Entergy expects that ASU 2016-02 will affect its financial position by increasing the assets and liabilities recorded relating to its operating leases. Entergy is evaluating ASU 2016-02 for other effects on its results of operations, financial position, cash flows, and financial statement disclosures, as well as the potential to elect various other practical expedients permitted by the standards.
Entergy New Orleans has requested to restructure electric rates to take into account the addition of electric operations in Algiers, such that a single set of rates will be charged in the City of New Orleans, including an increase in its electric customer charges. Entergy New Orleans’s request also includes: a 10.75% return on equity; a three-year formula rate plan for electric (with decoupling) and gas operations, each with a 100 basis point bandwidth (i.e., 10.75% +/- 50 basis points); realignment of capacity and long-term service agreement expense from riders to base rates; implementation of riders for 1) contemporaneous recovery of net cost of advanced metering infrastructure, 2) contemporaneous true-up for existing capacity and long-term service agreement expense, as well as new capacity such as power purchase agreements and battery storage (through the purchased power capacity and acquisition cost recovery rider), 3) recovery of distribution grid modernization, gas infrastructure replacement program, and interim energy efficiency, and 4) permanent recovery mechanism for demand-side management activities, including putting into rate base the costs of demand side management activities and contemporaneous recovery of lost contribution to fixed costs; new depreciation rates for electric and gas assets; and proposed implementation of new voluntary customer offerings (such as green power, fixed bill, community solar, pre-pay electric and gas service, and electric vehicle charging infrastructure options).
As discussed in the Form 10-K, in October 2015 the EPA issued a final rule lowering the primary and secondary NAAQS for ozone to a level of 70 parts per billion. States were required to assess their attainment status and recommend designations to the EPA. In January 2018 the EPA proposed that the following counties and parishes in Entergy’s service territory be listed as in non-attainment: in Louisiana, Ascension Parish, East Baton Rouge Parish, West Baton Rouge Parish, Iberville Parish, and Livingston Parish; in Texas, Montgomery County. In addition to Lewis Creek in Montgomery County, Texas, Entergy owns or operates fossil-fueled generating units in East Baton Rouge Parish (Louisiana Station) and in Iberville Parish (Willow Glen), Louisiana. In May 2018 the EPA issued its final designations for the 2015 Ozone NAAQS. The following parishes/counties initially were proposed as non-attainment, but designated as attainment in the final rule: in Louisiana, Ascension Parish, East Baton Rouge Parish, West Baton Rouge Parish, Iberville Parish, and Livingston Parish; in Texas, Liberty County and Waller Counties within the Houston-Galveston-Brazoria area. The final designations are effective on August 3, 2018. Entergy will continue to work with state environmental agencies on appropriate methods for assessing attainment and non-attainment with the new standard and, where necessary, in planning for compliance. Following designations by the EPA, states will be required to develop plans intended to return non-attainment areas to a condition of attainment. The timing for that action depends largely on the severity of non-attainment in a given area.
In December 2016 a transformer inside the Hartburg, Texas Substation had an internal fault resulting in a release of approximately 15,000 gallons of non-PCB mineral oil. Cleanup ensued immediately; however, rain caused much of the oil to spread across the substation yard and into a nearby wetland. The Texas Commission on Environmental Quality (TCEQ) and the National Response Center were immediately notified, and TCEQ responded to the site approximately two hours after the cleanup was initiated. The remediation liability is estimated at $2.2 million; however, this number could fluctuate depending on the remediation extent and wetland mitigation requirements. In July 2017, Entergy entered into the Voluntary Cleanup Program with TCEQ. Additional direction is expected from TCEQ regarding final remediation requirements for the site. In November 2017 additional soil sampling was completed in the wetland area and in February 2018, a site summary report of findings was submitted to the TCEQ. The TCEQ responded in June 2018 and has requested an ecological exclusion criteria checklist/Tier II screening-level ecological risk assessment, an additional site assessment, additional soil samples, groundwater samples, and some additional diagrams and maps. Entergy has developed and is implementing a response plan addressing TCEQ’s requests.